Broad Ripple Random Ripplings
search menu
The news from Broad Ripple
Brought to you by The Broad Ripple Gazette
(Delivering the news since 2004, every two weeks)
Subscribe to Broad Ripple Random Ripplings
Brought to you by:
VirtualBroadRipple.com Broad Ripple collector pins EverythingBroadRipple.com

Everything Broad Ripple HomearrowRandom Ripplings Homearrow2008 04 11arrowRandom Rippling

back button return to index button next button
Converted from paper version of the Broad Ripple Gazette (v05n08)
Random Rippling - Monon Trail detour in place
by Alan Hague
posted: Apr. 11, 2008

Bowen Engineering began construction of the floodwall along the Monon at 67th Street on Wednesday, April 2, 2008. Therefore, the trail will be closed from Wednesday, April 2 through Wednesday, April 16th, 2009.
The temporary access trail will be opened thereby diverting trail traffic down Cornell. Flagmen will be present from 7:30 a.m. to 4:00 p.m. at the detour points on a daily basis. After 4:00 p.m. appropriate signage will be installed.



alan@broadripplegazette.com
back button return to index button next button
Brought to you by:
BroadRippleHistory.com Broad Ripple collector pins EverythingBroadRipple.com
Brought to you by:
EverythingBroadRipple.com RandomRipplings.com Broad Ripple collector pins