Broad Ripple Random Ripplings
search menu
The news from Broad Ripple
Brought to you by The Broad Ripple Gazette
(Delivering the news since 2004, every two weeks)
Subscribe to Broad Ripple Random Ripplings
Brought to you by:
VirtualBroadRipple.com Broad Ripple collector pins EverythingBroadRipple.com

Everything Broad Ripple HomearrowRandom Ripplings Homearrow2011 03 18arrowRandom Rippling

back button return to index button next button
Converted from paper version of the Broad Ripple Gazette (v08n06)
Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
posted: Mar. 18, 2011

The underside of the Guilford Avenue canal "rainbow" bridge is deteriorating. Work will include stripping back a portion of the arch concrete and replacing it. The decorative railing will be removed so a new base can be poured. The railing will be set into the new base. A detour will direct traffic to Westfield Boulevard.

Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan


Random Rippling - Repairs scheduled for 105 year old Rainbow bridge
Quan




back button return to index button next button
Brought to you by:
BroadRippleHistory.com Broad Ripple collector pins EverythingBroadRipple.com
Brought to you by:
EverythingBroadRipple.com RandomRipplings.com Broad Ripple collector pins