Broad Ripple Random Ripplings
search menu
The news from Broad Ripple
Brought to you by The Broad Ripple Gazette
(Delivering the news since 2004, every two weeks)
Subscribe to Broad Ripple Random Ripplings
Brought to you by:
VirtualBroadRipple.com Broad Ripple collector pins EverythingBroadRipple.com

Everything Broad Ripple HomearrowRandom Ripplings Homearrow2011 04 01arrowRandom Rippling

back button return to index button next button
Converted from paper version of the Broad Ripple Gazette (v08n07)
Random Rippling - Rainbow bridge rehab scheduled
posted: Apr. 01, 2011

The rehabilitation of the Rainbow bridge on Guilford Avenue that spans the Central Canal is schedule to begin in mid May. The bridge is planned to be completely closed to all traffic, vehicular and pedestrian, for four months.
In addition to the structural repairs, most of which are on the underside of the bridge, the side rails will be brought to current standards. Code specifies that bridge sidewalls be at least 3.5 feet high. The rails will be removed and reset into a new concrete base that will bring them to the required height.

Random Rippling - Rainbow bridge rehab scheduled
Quan




back button return to index button next button
Brought to you by:
BroadRippleHistory.com Broad Ripple collector pins EverythingBroadRipple.com
Brought to you by:
EverythingBroadRipple.com RandomRipplings.com Broad Ripple collector pins
Brought to you by:
Broad Ripple collector pins RandomRipplings.com VirtualBroadRipple.com
Brought to you by: